Sunday, February 15, 2015

St. Petersburg, Vyborg district, st. Orbely, 27, Bldg. 5. At the site of the former training and pr

Public information system
St. Petersburg, Vyborg district, st. Orbely, 27, Bldg. 5. At the site of the former training and production company for the blind (but who needs them?) In Dan. being produced demolition. It seems that (the authorities do not share the same information), are going to build a 25-storey residential building. Around - 10 living. houses some - cracked. From them to the fence construction of 6-12 meters. Normal driveways not (only street in 2 bands). Soil - bad. But the area is good :). We will build barricades?
In the Vyborg district of St. Petersburg, at the address. Orbely, d. 27 Bldg. 5 in 2011, was demolished three-storey building of the former Training and Production Enterprise "Contact" All-Russian Society for the Blind. The owner of the land before the demolition was JSC "Investment and Construction Corporation" Stroykomplekt ". It was ruled St. Petersburg Government of December 16, 2008 1602 "On approval of the project plan with the project surveying the quarter 35 pr.Toreza area bounded Svetlanovsky ave., Pr.Toreza, Institutsky ave., 2nd Murinsky ave., in the Vyborg district " (http://gov.spb.ru/law?d&nd=891800551&razdel=888800001&prevDoc=891800551&spack=110listid%3D010000000100%26listpos%3D1108%26lsz%3D2441%26nd%3D1300077%26nh%3D0%26razdel%3D888800001%26start%3D1100%26?d&n ). From this it follows food heat lamp that on the land ( 35), an area of 0.99 hectares is planned to build a residential complex with built-in facilities and parking for 224 cars. It is also said: "the territory food heat lamp of the unit provides driveways with a minimum width of 5.5 m. Driveways organized by Svetlanovsky ave., Pr.Toreza, Institutskiy ave., 2nd Murinsky ave., Ul.Orbeli, Split Street. M.Obezdnoy st., alleys Academician Likhachev ".On prior public hearings on surveying residents of neighboring houses were strongly against such plana.Pozzhe became clear that this apartment complex is a 25-storey, ie height of 75 m. In this case, standing next to the house (and almost all the houses in the neighborhood) - 5- and 9-story. Thus the planned building will be above all others in the three (3) times. It should be noted that several residential buildings are in close proximity to the fence's proposed construction - at a distance food heat lamp of 6-12 m. All the houses of the 1960s buildings, brick, many flawed. food heat lamp Primers - water-saturated, disperse, with quicksand. Existing homes may suffer even at excavation - and even taking into account the construction of an underground garage. To the north of the proposed building are 4 houses. During the construction of high-rise buildings to the south of them about insolation food heat lamp (ie direct food heat lamp sunlight into the room) their residents will have to forget. Two houses to the west and the east of the planned building too much postradayut.Ukazannoe in the Resolution number 1602 "device driveways with a minimum width of 5.5 m" in this case is physically impossible. Access to the site number 35 is only possible from the street. Orbeli street and the so-called separate (which, food heat lamp in turn, she departs from the street. Orbely). Roadway on the street. food heat lamp Orbely - is one row in one direction and one row to another. In addition, it (a few meters from direct food heat lamp access to the site number 35) is a high school number 105, so in the morning and in the afternoon overcrowded vehicles; so at other times there are traffic jams. St. Separate - actually vnutridvorovye travel, there are not two cars to pass one another. And on it - also a school ( 534). Separate the morning often "gets." How will disperse hundreds of extra 2 cars in plus to the already existing? Endure whether existing network engineering (and so do not work as "excellent") such a huge additional burden? Also, in the vicinity of the land plot number 35 (50-60 m) Transfiguration Church is built in the XIX century (1889). It began to restore 10 years ago, the bell tower was built from the ground up; work carried out so far. There is a guarantee that he will not suffer? Residents of nearby houses in the last two years have repeatedly appealed to various committees, administration and so on. Last reply we would like to reassure the development plan RU 78113000-5150, designed by the land plot number 35 on the treatment of JSC " ICC "Stroykomplekt" was approved February 24, 2009 but with 10 March 2009 entered into force new rules of land use and development (PHC) in St. Petersburg. Therefore, the issuance of a building permit on this site is not possible until the development plan will not be given in compliance with the new PZZ.I suddenly, in hindsight, it appears that the August 12, 2013, a meeting of the arbitral tribunal between JSC "CLAIM" Stroykomplekt "(applicant ) and the State Construction Supervision and Examination (defendant). The Court invalidated the refusal of the defendant to issue a building permit and ordered ... to give this permission! But from the file that the urban plan of land corresponding to the new PHC have

No comments:

Post a Comment